Ways of determining reservoir pressure during PTA.
General information
Training platform:
Skype for Business
The date of training:
by agreement with the customer
The training duration:
2 hours
Working language:
Russian
The number of trainees:
up to 15 people
The purpose
The purpose of this webinar is to give basic knowledge of determining reservoir pressure during well testing. To define the extrapolation methods, their features, to demonstrate strengths and weaknesses. Training is conducted in the form of audiovisual delivery (presentation) and subsequent discussion and answering trainees questions.
Expectations
- quality improvement of well testing;
- improved monitoring of field development;
- cost saving on ineffective measurements and testing;
Training programme
The theme/th> | Duration, min |
---|---|
Introduction. The main idea of reservoir pressure and ways of its calculation during PTA | 10 |
The calculation of reservoir pressure while analyzing IPR curve and pressure stabilization curve | 10 |
The calculation of reservoir pressure while analyzing non-steady flow curves: complete build-up and extrapolation | 10 |
Extrapolation in the absence of radial mode. Differential method | 20 |
Extrapolation in radial mode. Horner's method. MDH | 20 |
Interference of producing and injected wells influence in reservoir pressure extrapolation | 30 |
Analysis quality and fidelity for obtained information | 10 |
Conclusions. Recommendations. Answering trainees questions. | 10 |